This presentation will discuss the desire and engineering and construction challenges and solutions associated with stay cable replacement and raising the bridge deck to allow for the passage of larger ships into the Port of Savannah to extend the service life of the Talmadge Memorial Bridge in Savannah, GA.
Please note this presentation will not be recorded.
1.0 of CE Credit
Cliff Dwellers Club 200 S. Michigan Ave, 22nd Floor Chicago, IL 60604
Menu:
Cocktail hour: 5 – 6 pm
Presentation and dinner time: 6:00 – 7:00 pm
In Person: Member - $75; Non-Member - $115 Live Streaming: Member - $35; Non-Member - $50
In Person registration closes at 12 pm Central January 30th. Online registration closes one hour before the presentation.
Greg Hasbrouck, PEComplex Bridge Technical Director - Parsons
Greg Hasbrouck is a Complex Bridge Technical Director in the Chicago office of Parsons Corporation. He has 22 years of complex and long span bridge design experience including the design of tied-arch, cable-stayed, truss, segmental box girder, and steel plate girder bridges and large river pier foundations. Greg earned his bachelor’s degree in Civil Engineering from Duke University and his master’s degree in Structural Engineering from Princeton University. Greg is the chairman of the PTI DC-45 Cable-stayed Bridge Committee and served as a technical advisor for Parsons on the Talmadge project.
20 N. Wacker Dr., Suite 750Chicago, IL 60606
© Structural Engineers Association of Illinois